Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant.Requirements:1.Incinerator system complete with scrubber, pollution control system, water system, loading system, ash removing system and ifanything more option is available. we have to burn 10000kgs/day, We work 8 hours a day, so your incinerator should havecapacity to burn atleast 1400 or 1500kg/hr of waste.2.With complete system specification, power, water fuel requirements.3.Space requirements & floor plan4.Pre-installation requirements. Space, power, water, drainage system etc5.Fuel type” diesel or gas?6.All options available.7.How much will be delivery time8.You have to send your technical team for installation, user training, maintenance training for end user technicians.9.Maintenance schedule—what has to be done, daily, weekly, quarterly, half yearly, annually.10.What are the replacement items during one year.11.Your system should meet all local & international standards with respect to handle of tobacco dust before feeding toincinerator, gas emission, waste water discharge to public drain system, ass disposal etc.12.End used will send this dust to incinerator plant in bags of 300kg each, so we are expecting 35 bags of 300kg each per day,7 days a week.13.How many engineers or technicians you will send for installation, how many people, what machines & tools you want us tomobilize to facilitate your people to do the installation. how many days installation & training will take.14.What will be your charges for installation visit.15.If you have some picture of such big installations, references(within this region is helpful if you have), you can provideus.16.Quote the best possible prices. With country of origin, all certifications the system has.