Laboratory waste Management system
01. Liqued water purification system.
02. Number of laboratories – 05
03. The estimated liquid water waste – 6000 L including
a. chemicals
b. toxins
c. Bio Hazardous materials.
Temporary allocated space for purifications system- 30×20
The following should be indicating in the biding document
1.Method of disposing treated waste water
2.Method of discarding the sludge
3.To follow ISO standard/regulations of Central Environment Authority[CEA]
4.Time frame for construction
5.Request the cost for each item of the project [Consultancy/designing/construction] as well for the whole project.
6.Warranty period and maintaincne.
a. Pre-assembled, containerized type
b. Burning rate: 100 – 120kg / hour
c. Minimum operating temperature: 8500c (Primary combustion)
d. Maximum operating temperature: 14500c (afterburner chamber)
e. Secondary Burning capacity: Compulsory.
f. Density insulation: 20 mm high
g. Refractory casting: minimum 65mm
h. Heavy duty refracting lining to withstand 15000c
i. Average burn out time: maximum 3.0 hrs
j. Fuel type: fuel oil (diesel)
k. Fuel consumption in L/hr: 7.5 to 9
l. Residency time in secondary chamber: 2 secs.
m. Residue ash post 100kg Max 3.8 kg
n. Installation period Maximum 7days.