Mobile Incinerator Units to properly incinerate Solid Waste, Petroleum Oil, and Lubricants. Each Unit will be in accordance to the technical
specifications/ operational capacity as defined below. Additionally, each Unit will provide Operation Manuals and Training Material.
1)Process At Least 1 Metric Ton Of Waste Per Day
2)Operable By 1 Person, With No Training Required
3)Regular Maintenance Can Be Completed By 1 Person With Limited Training
4)Regular Maintenance Should Not Exceed 1-Hour Per Day
5)Complies With Euro / Or Us-Epa Emission Standards
6)Ability To Incinerate Waste Petroleum, Oils, And Lubricants
7)Tempratures During The Combution Process Must Exceed 1,500 °F For At Least 1-Hour
8)Can Be Transported To And From Deployment Location In A 20-Foot Or Smaller Shipping Iso Container
9)Capable Of 24 Hours Of Continuous Use
10)Automatic Loading System
11)Automated Ash Removal System
12)Gas Scrubbing System
13)95% Reduction Of Solid Waste
14)Operable With Diesel, Jp8, Or Fuel Oil
15)Capable Of Burning 4 Units Of Waste Per Unit Of Fuel
16)Able To Incinerate Combustible Waste To Include: Paper, Plastic, Cardboard, Food, Used Oils, Sludge, Oily Rags, And Wood Pallets.
17)No Pre-Treatment Of Waste Required
18)Vendor Repair Offered At Point Of Shipment
19)Five (5) Year Component Warranty From Date Of Acceptance
1)Operation Manual And Training Manual For Each Incinerator Provided As Part Of Bid Package
2)Set Up And Installation Instruction Manuals Provided As Part Of Bid Package
3)Blue Print/ Schematic Provided That Outlines The Physical Dimensions Of The 20-Foot Containerized Incinerators
4)Delivery Plan To Explain The Movement Of 20-Foot Incinerators From Point Of Origin To Camp Arifjan, Kuwait
5)Mobility Plan To Explain How To Move 20-Foot Incinerators From Base To Base Within Us Army Central Command Theatre
6)Incinerators Composed With Heavy Duty Welded Construction
7)Each Individual Unit Operated And Transported In A 20-Foot Iso Shipping Container
8)Unit Can Be Fully Accessed, For Maintenance And Operation
9)Primary / Secondary Temperature Controls
10)Combustion Air Damper
11)Vapor Tight Light Fixtures & 120v Outlet
12)Outdoor Plug-In Receptable For Electrical Source
13)Outdoor Fuel Train With Shut-Off
14)Load Ramp
15)Skid C Mounted Fuel Tank
16)Electrical And Fuel Oil Connectors
17)Control Panel And Air Louver
18)Air Manifold Access And Utility Bulkhead
19)Galvanized Shipping Covers
20)Fuel, Water, And Oil Connector Lines
21)Primary And Secondary Burners
22)Fully Integrated Programmable Logic Controller (Plc) System
23)Factory Tested, Wired Prior To Shipment
24)Any Assembly And Disassembly Necessary For Operation Of The Unit Will Not Exceed 2-Hours, Must Be Able To Be Completed By 1-Person, And
Does Not Require The Use Of Heavy Equipment (E.G. Forklift, Cranes, Etc.)
25)Height Of The Entire System When In Operational Configuration (Measured From The Base Ofof The Container, To The Highest Point Of The Unit)
Is Not To Exceed A Maximum Height Of 15-Feet.