To provide for diesel service tank (Capacity 400 litres) including level indicator The tank should be connected to the incinerator at a higher level to enable free-flow of diesel from the tank to the incinerator. The connecting pipe must be a black pipe of approved gauge and diameter. Include other accompanying accessories and fittings Installation & commissioning works Positioning of Incinerator: – Provide lifting gears as forklift, gantry, rollers, and lifting jacks and position incinerator. Connect burners to fuel supply. Chimney Installation: Composition of the chimney: – Provide a chimney with scrubber (for filtration) Provide lifting gear to hoist, erect and mount chimney, and provide supports slings as necessary. Allow for cutting of tree branches to facilitate the exercise. The chimney shall be painted with approved heat resistant paint after installation. Feed Capacity600-1200 kg per feed600-1200 kg per feed Burning RateMin. 300 kgs per hourMin. 300 kgs per hour Burning Time per Feed2-4 hours2-4 hours Voltage380V220V/380V Power1.48Kw1.48Kw Frequency50Hz50Hz FuelNatural Gas or Diesel OilNatural Gas or Diesel Oil Fuel ModeManualManual Fuel Consumption (Oil)Max 40 kgs per hour31.0-59.0 kgs/houruel Consumption (Gas)Max 44 m3 per hour Waste Combustion Chamber2400 liters2400 liters Post Combustion Chamber1200 liters1200 liters Oil Tank Capacity500 liters500 liters Chimney10.0 M10.0 M Chamber MaterialFirebrick, Refractory ConcreteFirebrick, Refractory Concrete Max. Heat Value340,000 Kcal per hour590,000 Kcal per hour Operation Technical Specification Solid Chamber Temperature800 Deg. C – 1000 deg. C800 Deg. C – 1000 deg. C Gas Chamber Temperature1000 Deg. C – 1200 deg. C1000 Deg. C – 1200 deg. C Chamber Anti-Rate1450 Deg. C1450 Deg. C Residency Time2.0 Sec.2.0 Sec. Burning efficiency>98%>98% Waste Lower Calorific Power3000 Kcal3000 Kcal